#1 Original Driveway #2 Bulldozed Driveway #3 Original Entrance Field #4 Leveled Entrance Parking Pad for Multi-Use Facility Another Angle Multi-Use Pad Bulldozers on the Pad Pyro Jerry Nygaard Warren Camp at Camp! Lumberjacks at CO Laying Out the New Cabin Gary Drilling Sonatube Holes, each hole is 8-12 feet deep Sonitube AKA Sonic Tube, 24" diameter concrete form

<< back to Buildings < Camp Pictures > forward to Big Floor >>